They are not designed to soundproof a room.
Mur design wall panel installation.
Easy to install affordable and 100 recycled wood.
Decorate each room in style with our high end quality products.
Although it is possible to install the panels on a surface other than a wall of gypsum or plywood we recommend having a solid base and level.
Dress your ceilings with style and elegance.
Discover our audacious trendy and exclusive wall collection.
Above all store your walldesign panels for a period of 48 to 72 hours in the room where you plan to install them.
Plan an interval of 0 476 cm 3 16 inches at the corners of the walls as well as a space of 1 9 cm 3 4.
The board panel has an upside of 2 that may extend in 1 increments.
Place panels flatly on their length of 2 438 m 8 feet against the wall in way to allow air circulation between panels.
To successfully install your walldesign panels.
The design wall system is a structural panel with optional louvered style venting.
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
It may be installed horizontally or vertically.
It is preferable that the panels can be securely glued and nailed.
Your walls must be leveled as much as possible.
Place panels flatly on their length of 2 438 m 8 feet against the wall in way to allow air circulation between panels.
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level.
Murdesign offers a wide array of decorative wall and ceiling panels for your home.
A simple precaution will guarantee the problem free installation of your long lasting panels.
Your walls must be leveled as much as possible.
Murdesign s tiles and panels have acoustic characteristics similar to those of gypsum.
You need to pay particular attention to the level of humidity of the room where you will fix panels.
Take into account the humidity level of the room where you will be installing your panels.