Although it is possible to install the panels on a surface other than a wall of gypsum or plywood we recommend having a solid base and level.
Mur design wall panels installation.
Murdesign offers a wide array of decorative wall and ceiling panels for your home.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
They are not designed to soundproof a room.
It is preferable that the panels can be securely glued and nailed.
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level.
A simple precaution will guarantee the problem free installation of your long lasting panels.
Place panels flatly on their length of 2 438 m 8 feet against the wall in way to allow air circulation between panels.
Plan an interval of 0 476 cm 3 16 inches at the corners of the walls as well as a space of 1 9 cm 3 4.
You need to pay particular attention to the level of humidity of the room where you will fix panels.
Walldesign walldesign dress up your walls half walls and ceilings with quality decorative tiles panels offered in contemporary rustic and classic styled designs.
To successfully install your walldesign panels.
Take into account the humidity level of the room where you will be installing your panels.
Decorate each room in style with our high end quality products.
Your walls must be leveled as much as possible.
Above all store your walldesign panels for a period of 48 to 72 hours in the room where you plan to install them.
Instruction guide murdesign panels preparation.
Before fixing panels place them without glue to ensure they fit properly.